Installation hmanga fimkhur taka heat exchanger unit kimchang taka hman theihna tur ruahmanna siam .

Jul 09, 2025 Message pakhat dah la .

Automatic heat exchange unit hian installation laiin technical requirement leh precaution hrang hrang a zawm a ngai a, chutiang chuan installation hnuah a thawk tha thei ang a, fault tihtlem hmangin service life pawh a ti rei thei ang. Chuvangin, automatic heat exchange unit installation link chu a bik takin ngaihven tur a ni. Chuti a nih chuan, automatic heat exchange unit install hunah eng nge tihhlawhtlin tur?

 

Technical lama thil tulte chawimawi tur: 1.1.Hoisting department chuan lifting equipment leh rigging zawng zawng chu a buatsaih vek tur a ni a, regulation angin uluk takin a enfiah tur a ni a, chu chu hoisting equipment te integrity a nih theih nan a ni. Fully automatic heat exchanger group diameter chu a lian a, heat exchange tubes chu a tam a, lifting mass pawh a lian a, lifting binding chu a shell-a thickened pad plate hmanga support-ah thlan tur a ni a, thing block-te chu shell sir lehlamah dah tur a ni a, chutiang chuan shell chu a hmin a, plastic deformed leh chhiat loh nan a ni.

 

Installation awmna hmun leh a lungphum mamawhna:Fully automatic heat exchange unit installation awmna hmun hi a pawimawh hle. A theih ang anga stable leh well-ventilated site thlan a pawimawh a, pawn lam vibrations leh high-temperature environment te pumpelh a ni. Chutih rual chuan, hmanrua dahna hmun chu hnathawh leh enkawlna atan a remchang a, nitin enfiah leh tihfai hna thawh awlsam a ngai bawk. Thil hmanrua zawng zawng chu pre-a base-ah fastered vek tur a ni a, chutah chuan base chu concrete foundation embedded part-ah fasten tur a ni. Tui khawlkhawm chu drainage point-a hruai turin 100mm drainage ditch chu base leh foundation velin dah tur a ni. Chu bakah, Equipment Foundation chhehvelah hian operating space tling tak dah tur a ni a, a tlangpuiin operating space 500mm reserve tur a ni.

 

Installation dimension leh deviation mamawhna:Part size tinte deviation hian standard requirements a tlin leh tlin loh enfiah a ngai a, chu chu installation process chhunga unit dimension dik tak a nih leh nih loh enfiah a ngai a ni.

 

Support install dan tur: 1.1.Sliding plate chu foundation moving support side-ah embedded tur a ni a, anchor bolt sir lehlamah shims a awm bawk. Equipment level a nih hnuah chuan inclined shim chu generator set base plate hmangin nghet takin weld theih a ni a, mahse lower flat shim emaw sliding plate emaw nen weld a ni lo ang a, shim chu a smooth leh flat tur a ni a, chutiang chuan moving support chu free expansion leh contraction a awm theih nan.

 

Pipeline connection mamawhna: 1.1.Pipeline connect dawn chuan connection a nghet leh a seal theih nan a tul a ni. Pipeline connection nghet leh rintlak a nih theih nan sealing material leh technique dik tak hmang ang che. Chutih rual chuan, pressure hloh tihziaawmna tur leh hmanrua heat transfer efficiency tihchangtlun nan pipeline bending tam lutuk leh contraction neih loh tur a ni. Unit nena inzawm pipeline chu force tel lovin connect tur a ni a, thermal expansion a tikhawtlai tur a ni lo. Structural form ang chuan unit tawp pahnihah hian hnathawh, tihfai leh enkawlna mamawh phuhrukna tur hmun remchang dah tur a ni.

 

Electrical connection mamawhna: 1.1.Electrical connection-te chuan hmanruaa electrical mamawh phuhruk tur a ni a, chu hmanrua electrical drawing-te chu connection atan a zawm tur a ni. Short circuit leh leakage awm loh nan cable insulation performance enfiah thin ang che. A hnathawh dan tur a nghet theih nan hmanrua grounding chu rintlak a nih theih nan enfiah rawh.

 

Debugging leh trial kalpui dan:Infrastructure installation zawh hnuah hmanrua chu debug a ni a, trial operation-ah dah a ni. Trial operation stage chhung hian hmanrua chu a hun takah aw pangngai lo, vibrations leh leak, etc. A circulating pipeline hawng la, secondary circulating pipeline chu fluid medium hmanga khat a nih leh nih loh finfiah la, circulating pump chu start rawh Tui lum return valve chu hawng la, zawi zawiin heat medium valve chu hawng rawh. A khar hunah chuan operation chu a kalh zawngin an kalpui thin.

 

Thuhmahruaiah chuan, fully automatic heat exchanger unit install hmain, hmanrua mamawh hriatthiamna chiang tak neih theih nan technical information leh installation manual kaihhnawih chu uluk taka zirchian a ngai a ni. Fully automatic heat exchanger unit installation process chhung hian personnel leh equipment te dinhmun nghet taka kalpui a nih theih nan operating procedures khauh taka zawm a ngai bawk.